Our price includes obtaining a building permit for the In-ground swimming pool within the G.T.A. within normal or average conditions and compliance with temporary fence requirements around the excavation for safety purposes. It is the owner’s responsibility to provide any deposits required for grading, curbs, sidewalks and trees etc. Other issues that may need to be addressed could include; geo-engineering evaluation, letters and or drawings, conservation authority clearance, certain tree preservation, access through public or private lands not owned by the client, committee of adjustment preparation and proceedings, acquisition of minor variances, un-assumed lots, etc. The homeowner is also responsible for providing the necessary association approval letters.

Published in: Design FAQ's